Heritage Timber, Tree Rings, and Fire

Post and beam
Slow burning timber construction methods  circ. 1890

The past few days we have been sorting through the structures lab after the end of the last academic year. Among the materials which we were indexing and storing were the heritage timbers that we tested for the CSCE paper (posted below). The timbers were installed in a heritage building built approximately in 1890 or so. In a retrofit of a building they were removed. We tested the timber beam first in structural loading. The beam was tested for our second year undergrads to see. Then we extracted two planks from the timber as it only had moderate damage for flame spread testing (to be compared to modern engineered lumber of the same moisture content). Since then the planks have sat. Looking at the timbers myself and Mina Li, opted to count the tree rings this week to estimate the timbers age yesterday. Relating to Canada’s 150 we were in for a bit of a shock.